Wakefield Education Foundation
Home Page  Home Page   WEF  Education Foundation   button  Our Scholars   button  Hall of Fame   
WEF  Warrior News   button  Memory Lane    WEF  Memorabilia & Books   button  Class - Reunion News   
button  Donations   button  Volunteer   button  Contact Us  

Construction Images - May-August, 2012

More Pages:

button  July - August, 2011
button  September, 2011
button  October - December, 2011
button  January-February, 2012
button  March-April, 2012
button  October - December, 2012
button  January - February, 2013
button  Building Tour - April 4, 2013
button  August, 2013
button  Dedication and Grand Opening on September 22, 2013
button  Demolition - 2013
button  Demolition - 2014
button  Phase III - 2014

May 19, 2012

After a visit to the school for a planning meeting, we got a few pictures of the progress from a different angle. A lot has changed, but most of the work is being done inside the new structures.

Looking out of the second floow window allows you to see the three parts of the new main building  Looking out of the second floow window at the the new gym building
The new iron work from Dinwiddie Street near the entrance to the swimming pool  A closer look at the new gym building

June 13, 2012

After a hiatus of almost a month, a lot has changed, but most of the work is being done inside the new structures.

Looking at the iron work from Dinwiddie Street  Looking at the construction from George Mason Drive
From the pool acess drive the new gym area is coming along   A look at the new gym building from Dinwiddie Street

July 13, 2012

After a month that included a monster "Derecho" and 100+ temperatures, a there have been changes, but most of the work is being done inside the new structures. (Check out the first pictures taken exactly a year ago for a comparison.)

The area around the new gym contiunues to be built up  Looking at the construction from George Mason Drive
The internal work is progressing, with HVAC and plumbing systems going in  Looking at the new plywood sheathing from George Mason (between the trees)

August 17, 2012

Another month has passed, and most of the work is being done inside the new structures.

Looking at the construction from George Mason Drive  An internal view of the new cells, er um, classrooms
The work on the new gyms is progressing  Looking at the back of the gym area from George Mason